Completed Projects


HaEmek Rail Line A1

HaEmek Rail Line A1

The project includes the construction of the eastbound rail line in the north of Haifa. The project includes bridge works

HaEmek Rail Line A2-3

HaEmek Rail Line A2-3

Design and construction of the HaEmek rail line in the Tel Kassis area, including the construction of a rail overpass

Highway 6 – South

Highway 6 – South

The project included constructing section 4 of South Highway 6 section 1/2 between Shoket Junction and Lakiya. The project included

Highway 50

Highway 50

Bridge works, excavation and filling, on-site casting, and beams in the Jerusalem area – continuation of the Begin Highway. Financial

Yarkon Cemetery

Yarkon Cemetery

Construction of a four story building which will house 12,000 burial plots. Financial Scope: NIS 50 million Completed: 2014

Ayalon Highway – South

Ayalon Highway – South

Construction of the separate rail line. The work included removing and transferring the infrastructure and paving the new lanes without

Krayot Interchange

Krayot Interchange

This project included the construction of a U-beam bridge including the ramp (viaduct). Casting and prestressing were carried out on-site.

Pisgat Zeev

Pisgat Zeev

This project in Jerusalem included the construction of a bridge with prefabricated U-beams. Weight per Beam: 130 tons Client: The

Yigal Yadin

Yigal Yadin

This project in Jerusalem included the construction of 2 bridges from prefabricated segments. Each segment weighed 60 tons. A total

Golda

Golda

This project in Jerusalem included the construction of 2 bridges from prefabricated segments. The weight of each segment was 80

Acbara Bridge

Acbara Bridge

This is the highest bridge in Israel (80 meters), close to the city of Safed. The roadway was cast at

Ben-Gurion Airport 2000

Ben-Gurion Airport 2000

Large scale project over an area of approximately 800,000m2, including the following works: Earthworks and sub-base structure of approximately 1,000,000m3,

Ashkelon Power Station

Ashkelon Power Station

The construction of the Rutenberg power station in Ashkelon represents one of the most complex projects ever carried out by

Highway 3 (Latrun)

Highway 3 (Latrun)

The first and only concrete highway in Israel. The road was paved using the most advanced and innovative technology. The

Maccabit Highway (Highway 471)

Maccabit Highway (Highway 471)

A highway connecting the center of Israel to the Trans-Israel Highway (Highway 6). The project was built as a submerged

Ad Halom Interchange

Ad Halom Interchange

Construction of the interchange at the Ad Halom Junction in the south of Israel. The interchange includes a separate level

Yagur Interchange

Yagur Interchange

The project included the entire construction of the Yagur Interchange, one of the busiest junctions in northern Israel. The interchange

Krayot Bypass

Krayot Bypass

The Krayot Bypass project has now been completed. The project included the construction of a 12km fast intercity bypass and