Highway 6 – North (Sections 3 and 7)

North Highway 6 is a BOT project that includes financing, operation and maintenance of the highway section from the Yokneam area to the Somekh Interchange.

The construction of the project includes paving approx. 15 kilometers of highway (not including interchanges), as well as constructing 5 interchanges and 3 bridges, and excavating 3 double tunnels.

Use of the tunnels requires a toll.

The concession period will be approximately 34 years, including the construction.

The project was started in 2015.