Highway 6 Hotzei Hatzafon Highway
A mega-project that included designing, constructing, financing, operating and maintaining
a section of Highway 6 from the Yokneam area to the Somekh Interchange.
Work began in 2015 and included the paving of approximately 30 kilometers of expressways, the construction of five interchanges, seven bi-directional bridges and the boring of three bi-directional tunnels for a total length of approximately 10 km.
This complex project required the construction of mega-interchanges within active, busy roads, work in proximity to a railway track and areas with high environmental sensitivity, such as Nahal Kishon. Despite the complexity, Shapir completed the project’s construction ahead of the contractual date. Tunnel passage requires payment of a toll.
Client: Trans Israel
Period of Construction: 2015–2019
Financial Scope: Approximately NIS 4 Billion